BATHROOM COST CALCULATOR
Need to know how much your remodel will cost? This tool will help estimate the cost of most remodeling projects,
Plumber Connect:
Builder Connect:
*over 10 sqm onsite quote,.
gib fully change gib board onsite quote.
*flooring remove change new flooring board onsite quote.
Electricity Total Change Per One Bathrooms:
*For standard bathroom renovation Our Registered Electrician will replacement bathroom main light switch panel and one Power point 250v 10a. And will replacement heated tower rail 600mm*780mm size + 800*800 framless mirror with led round style Includes materials.
Tiling and Waterproof Connect:
*bathroom floor over 8 sqm need onsite quote.Because of the different styles of tiles involved and the different costs of different tiles This quotation includes all materials required to installation the tiles Quotation and final interpretation of the quotation is by eco smart ltd as standard .
Shower Details:
Other Fees:
Not include:
*ceiling and wall paint.
*door and window paint.
*half wall paint.
*above service all need onsite quote.